Lenzerheide, 2023

Substation and workshop of the power station

Roof-integrated PV system with a total of 151.3 kWp and attached PV system on the façade with 18.4 kWp. Installation as part of roof renovation and on a sheet roof.

What we do:

  • Specialist planning
  • Construction management